For those who serve. One Source Zero Compromise
Nationwide Vehicle Upfitting
Police vehicles and work trucks, sourced through licensed dealership partners, upfitted, and delivered nationwide under our lifetime installation warranty. Formerly Utilitac, FountFleet is now built to serve everywhere.
- Lifetime Warranty
- 500+ Agencies Served
- Cooperative Contracts
- Delivered Nationwide
Direct Integration With Major Manufacturers
READY TO DEPLOY.
Consistent availability, nationwide. We coordinate priority allocations for Chevrolet, Ford, Dodge, and RAM through a broad dealership partner network, with the reach to source through virtually any dealership in the nation.
Police Vehicles
Deploy turn-key patrol units to your department within weeks. Live dealership-partner inventory covers pursuit-rated SUVs and trucks from Chevy, Ford, and Dodge, all ready for lifetime warranty upfitting on one itemized quote.
- Pursuit-Rated SUVs & Trucks
- CO-OP Bids Ready
- 100% Turn-Key Upon Delivery
Work Trucks
One source for the chassis and the body, so nothing arrives incompatible and nobody points fingers. Class 3 through Class 6 platforms with aluminum and stainless bodies that refuse to rot.
- Dump Beds, Utility Bodies, and Flat Beds
- Nationwide Delivery
- Municipal Lease-to-Own
Vehicles are sold, priced and titled by our licensed dealership partners. FountFleet quotes and invoices the upfit, equipment and delivery separately.
The FountFleet
Upfitting Lifecycle.
Ten steps most fleets juggle across five vendors. We run all ten under one roof, and you watch every step from your portal.
Vehicle Configurator
Build and price custom police vehicles and commercial work trucks entirely online. Pick equipment in plain language, see it rendered on your actual vehicle, and get instant itemized pricing. Brackets, hardware, and compatibility are handled automatically.
Launch ConfiguratorVehicles & Sourcing
Our dealership partners sell and title the vehicle from their allocations, and a nationwide dealer network backs them up. The result: the police vehicle or work truck you want, available when the factory says “next year.”
View Inventory →Equipment Sourcing
Powered by Upfitter ProShop. We stock and source equipment from 100+ manufacturers, so every build ships with brands agencies have trusted for decades: Whelen, Federal Signal, SoundOff, Havis, Pro-gard, and more.
Visit ProShop →Transparent Quotes
Every quote is itemized in plain language: each part, its photo, its price, and where it mounts. Your council can read it. Your officers can read it. Nothing hides in a lump sum, which is exactly how we like it.
Paperwork & Portal
Securely upload tax exemptions and process title documents to purchase your next vehicle without ever leaving your couch via the FountFleet Portal.
Live Schedule
Stop guessing. Log in to see your chassis or police car arrival date, build slot, transportation status, and estimated delivery date.
Check Status →The Build
Upfitter University certified technicians build your vehicle to survive daily abuse, from coffee spills to excavator teeth. Every wire is labeled, loomed, and fused. Watch it come together through live build photos in your portal.
View Lifetime Warranty →Finalize
You paid for a new vehicle, it should arrive as a new vehicle when we’re done with it. We detail the vehicle, install your agency graphics, and mount customer-supplied radios.
Quality Control
Every vehicle earns its Triple-Check: three separate 100-point inspections by three different technicians, covering everything from factory USB ports to lightbar water resistance. You receive the photographed results of all three checks.
Nationwide Delivery
We deliver your complete, turn-key police or commercial fleet vehicle directly to your doorstep, anywhere in the nation. Whether you are one mile or a thousand miles from a FountFleet upfitting center, your upfit is backed by our lifetime installation warranty.
One Platform For Every Partner.
Select your sector below to see what the FountFleet platform does for your fleet, your service offerings, or your supply chain.
Police & Law Enforcement
Pursuit-rated police upfitting, K9 units, and fully custom patrol units designed for maximum officer safety and reliability.
Police Upfitting →Fire & EMS
Chief and battalion command vehicles, EMS interceptors, and brush trucks, plus lighting and electronics retrofits for engines, tankers, and pumpers.
Emergency Response →Municipalities & Public Works
Municipal fleet procurement without the runaround: direct access to cooperative purchasing contracts and lifetime warranty upfits from pickups to dump trucks.
Municipal Upfitting →Construction & Utility
Heavy-duty commercial work trucks, specialized service bodies, crane trucks, and flatbeds built to endure harsh utility job site conditions.
Commercial Upfitting →Snow & Ice Management
Commercial-grade snowplow installations, salt spreaders, and severe-duty winter weather lighting packages for reliable clearing operations.
Winter Equipment →Cooperative Contracts
Bypass the bid process. We hold major national cooperative contracts to ensure compliant, transparent, and hassle-free vehicle procurement.
See Our Contracts →Ready to Build?
Configure your fleet vehicle in minutes. Pick your chassis, choose your equipment, and get an instant itemized quote with every part pictured.
Own a FountFleet Franchise.
Leverage our brand, proprietary technology, supply chain, and training to open your own location.
Franchise InformationThis is not an offer to sell a franchise.