Production bays running on published upfitting lead times
Published Upfitting Lead Times

Current
Lead Times.

Technical perfection takes time, just not a year of it. Our upfitting lead times reflect the FountHarness wiring standard and the Triple-Check inspection, posted honestly and updated as capacity changes.

40 Business Days · PA
30 Business Days · GA
30 Business Days · TX
National HQ & Production Hub

Pennsylvania

40 Business Days, Chassis Arrival to Triple-Check

10 Bays Running · Room for 16

Southeast Service Hub

Georgia

30 Business Days, Chassis Arrival to Triple-Check

3 Bays Running · Room for 4

Central Texas Hub

Texas

30 Business Days, Chassis Arrival to Triple-Check

2 Bays Running · Room for 4

Builds route to the hub closest to you. See all locations.

Need to
Skip the Line?

Lost a vehicle yesterday and need one last week? Rapid Deployment units are ready to be built immediately from in-stock equipment. Zero equipment lead time, because the sourcing already happened.

See What’s Ready to Be Built Now
Why the Dates Hold

Upfitting Lead Times:
The Schedule Logic.

Three gates between chassis arrival and delivery, each one documented in your portal.

Step 01

Chassis & Inventory Sync

When your chassis lands, every component for your build is pulled from our 50,000 sq ft warehouse the same week. Nothing waits on a backorder you never heard about.

Step 02

Technical Build & Harness

Our technicians integrate the FountHarness electrical system: labeled, braided, fused, color-coded. You track this phase through live build photos in the portal.

Step 03

Triple-Check QC

The final gate. Three separate 100-point inspections confirm every bolt and connection meets the national FountFleet standard, with photo proof.

The FountFleet Portal tracking upfitting lead times with a live build schedule

Straight Talk on Lead Times.

What are the current lead times?

About 40 business days at our Pennsylvania headquarters and 30 at our Georgia and Texas hubs, from chassis arrival to Triple-Check sign-off. Build type sets the pace within that: a clean admin unit can clear in about 20 business days, while a K9 unit or SWAT van with long-lead equipment can run closer to 60. Your quote carries a real date for your actual build.

Why are these lead times shorter than the industry’s?

The system is boring on purpose: we stock chassis, we stock equipment, and we schedule against real bay capacity instead of hope. Published dates, kept.

How do I track my build?

The FountFleet Portal shows your build slot, live progress photos, transportation status, and estimated delivery date. If a date matters, tell us when you order and we schedule to it, no “just checking in” phone calls required.

A completed FountFleet vehicle cleared for national transport

Deployment
Authorized.

Once the Triple-Check is complete, your unit is cleared for national transport. From Ridgway to Anchorage, we deliver turn-key fleets ready for the road.